PQSE HOUSE · 프로젝트 가이드

High Bay vs Low Bay Lighting for a Small Prefab Warehouse

Start with where the lights will mount and what workers need to see. Compare the proposed fixture and its light distribution against the same shelving, work areas and door layout.

Start with where the lights will mount and what people need to see. High bay fixtures are generally intended for higher mounting positions, and low bay fixtures for lower ones. For a small prefab warehouse, compare the exact fixture and the way it spreads light over your shelves, aisles and receiving bench. The building’s name alone cannot tell you which fixture fits.

Plan around the shelf face and the working surface

A clear floor may look bright while the front of a shelf is difficult to read. Mark where workers pick stock, check a delivery or read a label, then ask the lighting supplier to assess those surfaces as well as the walking area. Fagerhult’s low-bay warehouse guide distinguishes light on vertical and horizontal surfaces.

높고 빈 강철 팔레트 랙 구획들 사이의 넓은 콘크리트 창고 통로.

먼저 이 페이지의 stock flow and storage layout. The proposal should place lights over the intended aisles and work areas, with the actual shelves and their heights shown. A lighting drawing for an empty shell leaves those obstructions out.

Round pendant lights below the steel roof frame and above a warehouse shelving aisle.

Compare the fixture’s light distribution

Request the exact fixture code and optic, the part that controls where the light goes. Philips GentleSpace gen4 is a high bay family with narrow through wide options. The Metalux LBLED is a low bay example with symmetric and asymmetric distributions. Those examples show why a category label or wattage alone cannot tell you how a fixture will light an aisle.

Use the same store layout for both lighting proposals
결정Give each supplierCompare in the replies
Actual mounting positionHeight of the proposed fixture and the supporting steel locationsFixture model, optic, fixture positions and mounting assumptions
Where people lookShelf heights, label faces, aisle locations and receiving benchPredicted light on the relevant vertical faces and horizontal work areas
건물 인터페이스Roof members, door operating space and proposed servicesClashes, fixture access and any work still needed on site

Resolve the roof and door interfaces

Mark the offered warehouse door’s track or coil on the same drawing as the lights. Opening a door uses space above or behind the door opening. Leave enough room for the selected equipment to operate and for maintenance access, as confirmed by the suppliers.

For prefab warehouse layouts, agree who supplies the fixtures, wiring and controls before approving the electrical scope. Carry the agreed items and responsibilities into the building utility schedule. Have the project team resolve emergency lighting separately where it applies.

자주 묻는 질문

Can rooflights reduce the need for electric lighting?

Rooflights can bring daylight to the store. Ask for a lighting proposal that covers the periods you actually work, including when daylight is insufficient. Review rooflights versus wall windows if the daylight openings are still undecided.

Do fewer, more powerful fixtures make the better quote?

Compare how each proposal lights the same shelves, aisle and work surfaces. Ask for the layout and calculated results for the quoted model and optic, with mounting and surface finish assumptions stated. A fixture count by itself cannot answer that.

Send one layout to everyone quoting

Share the plan, section, shelf and bench locations, normal working hours, and the chosen door arrangement. Ask each supplier to show the proposed fixtures on that same layout and specify what the building quote includes.

출처

LEDVANCE high bay and low bay selection guide for mounting and distribution considerations.

Fagerhult’s low-bay warehouse guide for the vertical and horizontal tasks. The Signify and Cooper Lighting product examples above illustrate different optics.

Discuss your warehouse lighting brief

계속 읽기

다음 모듈러 건축 프로젝트를 위한 더 많은 아이디어와 실용적인 조언을 확인하세요.

모듈러 건축 프로젝트에 대해 알려주세요

현장 위치, 필요 수량, 평면 구성, 용도 및 목표 납품일을 알려주세요. 당사 팀이 실용적인 제품 추천과 견적 준비를 도와드립니다.

중국 장쑤성 쑤저우

제조 및 프로젝트 지원 사무소입니다.

프로젝트 견적 요청