Request an insulated roller-door option when the opening forms part of a defined heated or cooled enclosure. Keep a non-insulated option in the comparison for ambient storage without a specified door thermal target. Insulation changes the curtain construction; it does not, by itself, select the seals, operating duty or environment inside the warehouse.
Para un prefab warehouse proposal, describe what you store and the conditions the building must provide. The door belongs in that brief, alongside the walls, roof and receiving routine.
What actually changes in the curtain?
Hold the opening mechanism constant first. If that choice is still open, compare roller shutters with sectional warehouse doors separately.
A non-insulated metal rolling curtain has no added insulating core. An insulated construction can add a back skin and insulation behind the front slats. For example, Janus’s 400 and 600 ranges distinguish a non-insulated service door from an insulated one; its 600 door sheet describes a steel backer and injected polyurethane foam. Other models can use different constructions.
Specify the proposed build-up rather than simply asking for a “grey roller door.” These manufacturer examples explain the difference; they do not identify a standard PQSE door offering.
Match the option to the store’s job
Start with the required indoor conditions, not an assumption that every warehouse needs the same door. The warehouse insulation guide addresses that wider enclosure decision.
| Pregunta | Non-insulated option | Insulated option |
|---|---|---|
| What is in the curtain? | Metal curtain without an added insulating core | Confirm the actual core and backer construction |
| When should it enter the comparison? | Access for an ambient store without a specified door thermal target | An opening in a defined thermal enclosure |
| What remains to be selected? | Seals, operating package and required performance | The same items; the insulating core does not replace them |
| How should prices be compared? | The complete specified door option | The complete alternative against the same opening and use |
An insulated curtain is a reason to request relevant thermal evidence, not a promise of a particular indoor temperature or energy saving. A door left open during receiving is also an open part of the enclosure: include how long it remains open, rather than comparing closed curtains alone. Link that routine to the receiving and handling arrangement in the guía de planificación de almacenes.
Keep insulation, sealing and operating duty separate

An insulating core does not establish air leakage or rain resistance. Teckentrup’s roller-shutter information declares thermal, air and water performance separately. Ask what seals and performance package accompany the proposed curtain.
Likewise, non-insulated does not mean low-duty. Janus lists both heavy-duty and high-performance non-insulated service doors. Select operating frequency, controls and the opening routine for the actual goods movement; do not use the insulation label as an operating specification.
Preguntas frecuentes
Can I compare insulation-core figures to choose the door?
They describe a different boundary from the complete door. DHF’s thermal guidance distinguishes the complete-door result from the lath or panel result. Ask what the supplied figure covers, its units, door size and configuration. The same boundary issue is explained in our building-insulation comparison guide. Do not treat the names “U-value” and “U-factor” alone as proof of different assessment boundaries.
Will an insulated door cost less to run?
That cannot be concluded from the label. A useful estimate needs the complete door and enclosure, local conditions, heating or cooling assumptions and door-open routine. Compare the specified offers without assigning an unsupported payback period.
Request two comparable door options
Send the opening dimensions, goods, required indoor conditions, receiving routine and site location. Ask which insulated and non-insulated arrangements are available, with the curtain, guides, hood, seals, operation, mounting interfaces and installation scope stated. Compare that complete package within the building order.