A single-loaded corridor serves rooms on one side; a double-loaded corridor serves rooms on both sides. For a modular dormitory, compare the resulting building outline, room-door positions and shared-space entrances using the same room mix. Neither label establishes the permitted occupancy, comfort or lower total price.
When requesting a worker camp accommodation proposal, show the rooms you need and the area available for the block. “Single-loaded” and “double-loaded” describe how rooms meet the passage, not two interchangeable building specifications.
What changes on the plan?
Agree the single and shared bedroom mix before comparing corridors. Otherwise, a proposal with different rooms or fewer residents may appear to be a better layout without answering the same requirement.
For a simple linear comparison with similar room frontages and depths, one-sided access places the rooms in one row. Two-sided access distributes them into two rows, with room depth on each side of the passage. That changes the depth of the block and the length occupied by each row. Corners, stairs, shared rooms and the actual site outline can change the result; two rows do not automatically mean half the building length.
| 比較する | Single-loaded arrangement | Double-loaded arrangement |
|---|---|---|
| Room entrances | On one side of the corridor | On both sides of the corridor |
| Simple room-row geometry | One row beside the passage | Two rows with the passage between them |
| Door approach | Review each entrance and the opposite corridor edge | Review entrances on both sides, including any opposing doors |
| Complete layout | Include stairs, shared spaces and connections | Include the same scope; room loading does not supply it automatically |
Mark the doors and nearby windows on the plan. Opposing doors need not line up directly, so review their actual positions rather than assuming every two-sided corridor has the same doorway relationship. This is a layout comparison, not a claim that either arrangement guarantees privacy or quiet rooms.
Keep room loading separate from enclosure
Single-loaded does not mean outdoor. In a UCLA Lewis Center interview transcript, architect Michael Eliason describes single-loaded access as either internal or external, with rooms on one side.

Record both decisions: which sides have room entrances, and whether the passage is enclosed or external. The interior-versus-exterior corridor guide covers that separate access choice. A loading label alone does not describe weather protection, ventilation or the complete route to the room.
Include shared spaces and building interfaces
The passage also serves common spaces. Sunbelt Modular’s college dormitory case identifies a double-loaded corridor and shared lounge areas in that particular project. Show such entrances on your own proposal rather than counting bedroom doors alone.
Keep the camp bathroom arrangement consistent between alternatives. An in-building shared bathroom entrance and a route to a separate block create different drawings to review.
Also identify where room modules, corridor construction and services meet. Lowney Architecture’s modular-design presentation discusses corridor service connections within its wood-volumetric building context. For the selected dormitory system, ask which corridor parts and connections are factory supplied and which are completed on site. Do not assume the room modules include the entire connecting passage.
よくある質問
Does double-loaded mean two people per room?
No. It describes rooms on both sides of a corridor. Room occupancy, bedroom count and module count remain separate quantities. Use the dormitory quantity guide to keep those counts distinct in the order.
Which arrangement is cheaper?
The corridor label cannot answer that. Compare proposals with the same rooms, shared facilities and building scope, including circulation and site connections. No matched quotation is established here, so there is no price ranking.
Compare two plans on one room schedule
Send the site outline, room schedule, resident groups, bathroom arrangement and shared-space requirements. Ask for the proposed room rows, door positions and corridor scope on the drawing. Keep the wider utilities and opening phases in the worker camp planning brief, so the selected block still fits the camp as a whole.