PQSE HOUSE · คู่มือโครงการ

Keyed Alike vs Keyed Different for Multi-Unit Site Offices

Choose keyed alike for doors that the same authorized staff need to open. Choose separate keys where access should stay separate. Record door IDs and the required key groups in the order.

Specify keyed alike when the same authorized staff need to open every door in a defined group with the same operating key. Specify separate keys when access should stay separate. Start with the doors and who needs to use them, then put the agreed groups and key-copy quantities on the office order.

Decide which doors should share an operating key

Allegion’s keying guide describes keyed alike as a shared operating key for a group of locks. In a basic keyed-different set, each lock uses its own operating key and that key does not open the others in the set. ASSA ABLOY’s keyed-alike overview gives examples of separate groups that can each share a key.

Suppose the same shift leads need both crew offices, and only the project administrator needs the records room. Give the two crew doors a shared group on the order and give the records room a separate instruction. Change those assignments if the intended users differ. The construction site office planning guide can help establish room uses first. The visitor-access guide covers the separate question of how guests are received and handed over.

Example order instructions for three site-office doors
Door on the example planWho needs to open itKeying instructionKey copies to confirm
D01, crew office AShift leadsShared group AState the total for group A once
D02, crew office BSame shift leadsSame group A as D01Include in the group A total
D03, records roomProject administratorSeparate from group AState the copies for this door separately

Check the door package and the group on the order

Door appearance gives little away about which keys will work. Agree the door and lock function separately from the grouping. The modular office door comparison helps establish which door assemblies to specify in the first place.

A lever handle and a separate lock cylinder on a modular office door.

Give each opening a door ID tied to the drawing. Say which IDs share a group, including doors on different quotation lines. Ask the supplier to confirm which hardware, keys and labels are supplied and who will verify the group at handover.

Confirm matching before ordering another unit

Adding an office that looks the same does not establish that its door can use the existing key. Schlage’s ordering guide distinguishes same-key groups within and across order lines. If your site office expands in stages, identify the group the new door should join and ask the proposed hardware supplier to confirm compatibility before ordering.

คำถามที่พบบ่อย

Does keyed alike mean the supplier sends only one key?

It describes which locks the operating key opens. Confirm the number of working copies and any spare copies as a separate order item.

What should we check if a shared key goes missing?

Check which doors it operated and tell the person responsible for site access. The response depends on that group and the site's access policy.

Send the door groups with the layout

For a construction site office proposal, send the floor plan and list the openings that should share a key. Identify separate doors, any existing group a new door should match, and the copy counts you want. Ask which parts of that hardware and keying scope can be included.

Sources include the Allegion and ASSA ABLOY keying explanations and the Schlage ordering example linked above.

Discuss your site office door requirements

อ่านต่อ

แนวคิดและคำแนะนำที่เป็นประโยชน์เพิ่มเติมสำหรับโครงการอาคารโมดูลาร์ครั้งต่อไปของคุณ

บอกเราเกี่ยวกับโครงการอาคารโมดูลาร์ของคุณ

แจ้งตำแหน่งที่ตั้งโครงการ จำนวนที่ต้องการ ผังการจัดวาง การใช้งาน และวันที่ต้องการส่งมอบ ทีมงานของเราจะช่วยจัดเตรียมข้อเสนอแนะผลิตภัณฑ์ที่เหมาะสมและใบเสนอราคา

ซูโจว มณฑลเจียงซู ประเทศจีน

สำนักงานผลิตและสนับสนุนโครงการ

ขอใบเสนอราคาโครงการ