PQSE HOUSE · GUIAS DE PROJETO

Awning vs Casement Windows for Modular Offices

An awning sash opens out at the bottom from a top hinge. A casement swings from a side hinge. For a modular office, compare the operator, exterior clearance and cleaning access for the exact window.

For the outward-opening windows compared here, an awning sash hinges at the top and opens at the bottom. A casement swings from a left or right hinge. Choose the action that fits the outside space, then compare how staff will reach the controls and how the cleaning crew will reach the exterior glass. Those jobs depend on the exact window and hardware.

Compare the operator as well as the hinge

The hinge tells you where the sash moves. It does not tell you whether staff turn a crank, push the sash or use a switch. Marvin offers crank-out and push-out versions in both its Ultimate Casement e Ultimate Awning lines. The awning range also shows a motorized option. These are examples of the choices to ask about, and availability depends on the proposed window.

A higher window can free wall space behind a workstation. Put the operator on the same drawing as the desk and any screen or blind. That lets you see whether staff can reach the handle without moving equipment. The container office fit-out guide covers the furniture and service layout behind this decision.

A hand holding the crank handle fitted at the bottom of a window frame.
Window choices to show on the modular office schedule
O que compararOutward-opening awningOutward-opening casement
Where the sash movesBottom edge moves out below the top hingeFree edge swings out from one side
What to show on the planBottom projection and reachable control positionLeft or right handing, swing and control position
What to confirm with the supplierOperator and screen, plus how the outside glass will be reachedOperator and screen, plus whether the specific model offers inside access for washing

Decide how the outside glass will be cleaned

A window on the exposed side of a site office may be easy to reach when the building is new. Later, a fence or the next module could make that access difficult. Mark the cleaning side on the same drawing used for site-office access planning.

This is where the exact hardware can change the choice. Marvin’s owner’s manual lists inside wash access for qualifying Ultimate Casement configurations and excludes its Ultimate Awning from that feature. Andersen’s awning guide calls for outside access to clean its awning windows. Ask for the care instructions for the model and size offered before relying on indoor cleaning.

Perguntas frequentes

Does a top hinge mean I can leave the window open in rain?

The open sash can shed some falling water, but the hinge does not establish when the actual window can be left open. Check the manufacturer’s instructions and account for the exposed side of the building.

Does the opening style decide the frame or glass package?

Specify those choices separately. The office window frame comparison e office glazing guide address the material and glass decisions. Ask which combinations can be supplied in the dimensions and opening action you need.

Show the window in use on the office drawing

Send the wall elevation and workstation layout. Identify the desired opening action, operator, screen and route for exterior cleaning. With the configuração de escritório em contêiner, ask which windows and operators are actually available and which are included in the quotation.

Sources include the linked Marvin Ultimate product pages and owner’s manual, plus Andersen’s guide to awning windows.

Discuss your modular office window requirements

Continue lendo

Mais ideias e conselhos práticos para o seu próximo projeto de construção modular.

Conte-nos sobre o seu projeto de construção modular.

Compartilhe a localização do local, a quantidade necessária, o layout, a aplicação e a data de entrega desejada. Nossa equipe ajudará você a preparar uma recomendação de produto e um orçamento práticos.

Suzhou, Jiangsu, China

Escritório de produção e apoio a projetos.

Solicitar orçamento do projeto