PQSE HOUSE · MANUFACTURER SINCE 2008

Container House
Manufacturer in China
for Global Projects

PQSE makes container houses and modular buildings for projects worldwide. We help with layouts, factory production, export packing and site assembly guidance. Our buildings serve construction sites, living quarters and commercial spaces.

PQSE modular building factory production and quality control
PQSE technicians inspecting a container house module
0 +
YEARS OF MANUFACTURING

Factory Production, Engineering and Quality Control

PQSE has made container houses and modular buildings for export since 2008. We have two production bases with over 60,000 m² of factory space. Our team has more than 200 people. Planned production capacity is 500+ standardized units per day; order capacity and scheduling are confirmed for the selected system. We support orders from one custom unit to a complete camp.

Factory-Based Production

Frames, insulated panels and complete modules are prepared through controlled fabrication, assembly and pre-shipment inspection. Standardized factory production reduces onsite work and supports repeatable quality across large project quantities.

Project Engineering Support

Our engineers review occupancy, room mix, local wind and load requirements, utilities, drainage and transport limits before the layout, configuration and bill of materials are finalized.

60,000+ m²

Production Area

Factory and production space for frame, panel and module preparation.

Documented Production Controls

Container office with white frame and black glazing, left 45-degree view
Container Office

Flexible modular workspace with insulated panels and utilities.

Portable bathroom module in light gray, left 45-degree view
Portable Bathroom

Complete bathroom module with toilet, shower and basin.

Portable shower unit in light gray, left 45-degree view
Portable Shower Unit

Multi-cubicle shower unit with ventilation and drainage.

Portable toilet unit in white, left 45-degree view
Portable Toilet

Toilet module with washable interiors and ready plumbing.

PQSE modular building factory exterior, aerial view

Built for Export Projects, Not Just Product Listings

PQSE supports building projects in more than 65 countries. Our two factories work with one team for design, buying, export packing and site guidance. That team follows your project from the first brief to delivery. Our after-sales response channel is open 24/7.

GLOBAL PROJECT EXPERIENCE

Projects Across 65+ Countries

Experience from worker camps, schools, offices, clinics and public facilities helps our team identify layout, climate, transport and installation risks early in the project. Explore our published projects.

ENGINEERING FOR LOCAL CONDITIONS

Climate & Structural Review

Wind and load requirements, insulation targets, drainage, utilities, occupancy and circulation are reviewed before module configurations and approval drawings are issued.

CONTROLLED QUALITY & DOCUMENTATION

Documented Quality Control

ISO, CE and SGS-related documentation, confirmed material specifications and optional third-party inspection support provide traceable checkpoints before shipment.

DELIVERY & 24/7 SUPPORT

Installation & After-Sales Support

Export packing plans, installation drawings, remote technical guidance and a 24/7 response channel support projects through unloading, assembly and post-delivery questions.

QUALIFICATION DOCUMENTS

Documents Available for Project Review

These references cover our management systems, product compliance, and independent checks or tests. The documents used for an order depend on the product, agreed specification and destination.

SGS

Inspection & testing

CE

Conformity documentation

ISO

Management system

NATA

Testing accreditation reference

IAF

International accreditation

CNAS

Laboratory accreditation

Modular Building Solutions by Project Type

Start with the job the building must do. Each solution combines the right module type, layout, utilities and delivery plan for the site.

Construction site office complex, aerial view

Construction Site Office

Site offices and support spaces configured for active construction projects.

Worker camp accommodation site, aerial view

Worker Camp Accommodation

Scalable accommodation, dining and service modules for workforce camps.

Modular classroom complex with central courtyard

Modular Classroom

Flexible classroom blocks planned around student capacity and site circulation.

Mining camp accommodation, aerial view

Mining Camp Accommodation

Durable camp layouts for remote mining operations and rotating workforces.

Modular emergency housing site overview

Modular Emergency Housing

Rapid-deployment housing layouts for temporary and emergency response needs.

Modular hospital exterior

Modular Hospital

Modular healthcare spaces organized for clinical flow and supporting services.

Modular retail shop and café opening onto a pedestrian forecourt

Container Shop

Retail shops, cafés and service counters with practical customer and staff space.

Prefabricated storage building with goods doors and a separate modular store

Prefab Warehouse

Storage buildings for tools, materials and stock, with access and office options.

Modular garage with two roller-door bays in a practical vehicle yard.

Modular Garage

Garage layouts for vehicle parking, tool storage and everyday workspace.

Modular hotel courtyard concept with low-rise guest rooms and garden paths

Modular Hotel Rooms

Double, twin and family guest rooms with bathroom and hospitality fit-out options.

From Brief to Delivery

Our process has eight stages, from the first brief to site support. At each stage, we record the drawings, scope, checks or packing details needed for the next step.

PQSE team reviewing a modular building project brief
STEP 01 · PROJECT BRIEF

Submit Your Project Brief

Tell us where the building will go and how it will be used. Include the site conditions, number of units, required capacity and target delivery date. Drawings, site photos or a room list help us review your needs.

PQSE engineers discussing modular building project requirements
STEP 02 · REQUIREMENT REVIEW

Initial Requirement Discussion

We review your brief and check what is missing. This may include room layouts, the building structure, utilities, packing or site work. We then identify a suitable building system for the next design stage.

PQSE technicians checking container house layout and configuration
STEP 03 · DESIGN DEVELOPMENT

Layout & Configuration

We arrange the modules around the rooms, walkways, doors, windows and utility points you need. You can review the layout, materials and module options before agreeing on the order scope.

PQSE team preparing a modular building quotation
STEP 04 · COMMERCIAL SCOPE

Quotation & Scope Review

Your quote lists the chosen design, materials, quantities and packing method. It also states what is excluded. Options are shown separately so you can compare costs and approve a clear scope.

PQSE technicians confirming container house specifications
STEP 05 · PRE-PRODUCTION

Technical Confirmation

Both sides approve the drawings, specifications, materials and key sizes before production starts. We record these details so the factory works from the agreed scope.

PQSE factory production and inspection of container house frames
STEP 06 · FACTORY EXECUTION

Production & Inspection

We make the frames, panels and other parts in the factory. The team checks their sizes and assembly against the approved design. We record the required checks before packing and shipment.

PQSE flat pack container house loading and delivery preparation
STEP 07 · EXPORT PREPARATION

Packing & Delivery

We protect and label the modules or packed parts for loading. Packing and shipping documents follow the product type, destination and agreed delivery terms.

PQSE installation support for a two-story modular building
STEP 08 · SITE SUPPORT

Installation Support

Your site team receives drawings, assembly instructions and remote guidance for the supplied system. We can review site questions using the approved drawings and packing records.

Customer Feedback

What Customers Value in Working With PQSE

Buyers in more than 65 countries use PQSE for design, production and delivery support. The published experiences below describe what customers valued after their buildings were delivered and put to use.

“
PHILIPPINES · MAN CAMP PROJECT

One Supplier for the Complete Camp Scope

“PQSE coordinated the accommodation buildings, steel workshop, furniture and camp equipment as one package. The completed camp met our operating requirements, and we would work with the team again.”

“
KENYA · MODULAR SCHOOL

Delivered on Budget and Still Performing

“The modular school was delivered within the approved budget and schedule. After two years of operation, the drainage and anti-corrosion performance remain reliable.”

“
INDONESIA · REPEAT CLIENT

Three Projects With Consistent Support

“We have completed three projects with the team. Communication is fast, the technical response is practical, and product quality has remained consistent.”

PQSE technicians inspecting a container house module

Common Questions Before You Order

We compare project duration, transport limits, site labor, space needs and reuse frequency before recommending a flat pack, folding, expandable or detachable system.
Please provide the country, application, quantity or capacity, preferred layout, site conditions, destination port and target schedule. Drawings or reference images are helpful.
Yes. Room layout, insulation, doors, windows, finishes, electrical and plumbing configurations can be reviewed against your project requirements and local conditions.
The packing method depends on the product system. PQSE prepares loading information and installation guidance so your logistics and site teams can plan in advance.
Available documents depend on the product, material and destination market. Tell us the required standard so the applicable certificates and reports can be confirmed before ordering.
We provide drawings, installation instructions and remote technical guidance. Project-specific support is confirmed in the quotation and technical agreement.
Share the site location and required design criteria. Our engineering team will review the structural and insulation configuration before final technical confirmation.

Need help with a site, climate or shipping route? Send us the details. Our team will tell you what else is needed for a technical review.

Tell Us About Your Modular Building Project

Tell us the site location, number of units, room layout, building use and target delivery date. We can then suggest a suitable product and prepare a quote.

Suzhou, Jiangsu, China

Manufacturing and project support office.

Request a Project Quote