PQSE HOUSE · PREFAB CABINS

Apple Cabins
for Sale

Create a modern space for guest accommodation, a private workspace or a reception area with PQSE House. Compare cabin formats, glazing and interior options, then plan the supply and delivery scope around your site.

PRODUCT OVERVIEW

A Modern Cabin, Planned for a Specific Use

The rounded shell and glazed front give an apple cabin its distinctive appearance. The right configuration also depends on what happens inside: where people enter, sleep or work, and how the room connects to the site.

Cabin format

Compact, extended or porch-led design

Room arrangement

Open room or a proposed partition layout

Glazing & privacy

Balance views, openings and solid walls

Interior scope

Discuss the shell and selected fit-out

Site connections

Plan power, water and wastewater access

Transport dimensions

Confirm the selected unit and packing format

CABIN OPTIONS

Choose a Cabin Format Around Your Brief

Compare the overall format before refining the interior. These design directions help shape the discussion; the selected model determines the final size and construction. Compare Apple and capsule cabins against one guest-room brief.

Compact Cabin

Start with a focused room brief for a small workspace or guest room. Position the entrance, furniture and any bathroom around the usable interior.

Extended Cabin

Discuss a longer footprint when the project needs distinct furniture zones or room divisions. Confirm transport dimensions together with the layout.

Cabin with a Porch

Add a sheltered transition between the room and the site. Agree whether the porch, decking, rails and access steps belong to the supply scope.

GLAZING & EXTERIOR

Balance the View, Privacy and Exterior Finish

Open Views

A larger glazed elevation opens the outlook. Consider orientation, shading, ventilation and furniture placement when choosing the window arrangement. Distinguish flat, faceted and curved glass when reviewing a rounded frontage.

More Solid Wall Space

Balance glass with wall areas for privacy, storage and room divisions. Review doors, opening windows and the view from neighbouring units.

Exterior Colour & Trim

Use the shell colour and surrounding trim to suit the setting. Confirm the selected surface material, finish samples and maintenance expectations.

INTERIOR PLANNING

Plan the Room Around Everyday Use

Treat the room arrangement, wet areas and selected equipment as one plan. An interior view shows a design direction; the final layout and inclusion list define the supplied cabin. If the entrance side needs to change, distinguish mirroring the floor plan from rotating the cabin.

Open Room & Kitchenette

Plan seating, sleeping or work areas before adding cabinetry. Confirm the working clearances, storage and selected kitchen equipment in the layout.

Bathroom & Services

Position the bathroom around privacy, use and maintenance. Include the fixtures, hot water, ventilation and connection locations in the project discussion.

WHAT COMES WITH THE CABIN

Make the Supply Scope Clear

Cabin shell

Define the frame, enclosure, windows, doors and floor construction.

Interior package

List partitions, finished surfaces, cabinetry, fixtures and any equipment separately.

Services & site work

Set the boundary between supplied installations and connections completed at the destination.

Request a proposed layout, material specification and itemized inclusion list with your quotation. Furniture, appliances, decking and site connections should be identified separately.

APPLICATIONS

Plan the Cabin Around Its Everyday Use

Guest & Resort Accommodation

Coordinate the room, bathroom, privacy and outdoor access within the guest experience and wider site plan.

Private & Project Workspaces

Arrange desk space, daylight, power points and privacy around the way the room will be used.

Reception & Small Commercial Spaces

Discuss visitor access, the counter or display arrangement, storage and services for the proposed business use.

DELIVERY & SITE PREPARATION

Check the Route from Factory to Site

Cabin dimensions and delivery conditions affect the transport plan. Confirm the shipping method, destination access and work to be completed on site before dispatch.

01 · Confirm the Shipping Format

Check the cabin dimensions, packing arrangement and shipping method for the selected model before booking freight.

02 · Plan the Last-Mile Route

Review delivery access, turning space, unloading area and the equipment needed at the destination.

03 · Prepare Placement & Connections

Coordinate the support positions, anchoring, lifting plan and service connections with the relevant project team.

PRICE & SUPPLY SCOPE

What Affects an Apple Cabin Price?

Cabin Size & Layout

Footprint, room divisions, entrances, windows and porch arrangement.

Shell & Glazing

Enclosure build-up, exterior surfaces and the selected glass and window systems.

Interior & Services

Partitions, cabinetry, bathroom, lighting and the agreed equipment package.

Order & Delivery

Quantity, packing, freight, destination work and the required schedule.

FREQUENTLY ASKED QUESTIONS

Apple Cabin Questions

An apple cabin is a prefabricated cabin style commonly associated with a rounded rectangular exterior and a glazed elevation. The name does not define one standard size or specification. Review the selected model, room layout and supply scope together.

Apple cabins commonly have a rounded rectangular shell, while space capsule houses often use a more pronounced pod-style profile. Names vary between suppliers, so compare the actual exterior, room layout, openings and transport dimensions when choosing between them.

Send your preferred footprint, intended use and room requirements. Compact and extended formats can be explored as design directions, but the final outside dimensions, usable interior and packing size must be confirmed for the selected model.

Include the fixtures, cabinets and equipment you need in the brief. The proposed layout should allow space for use, cleaning, ventilation and service access. The quotation should identify which items are supplied and which are optional.

Share the appearance, daylight and privacy needs for your site. The window arrangement, openings, cladding and trim can then be reviewed together. Request the actual material and glass specification for the model under discussion.

Compare an itemized scope covering the shell, interior work, equipment, packing and delivery boundary. A furnished image alone does not confirm that furniture, appliances, decking or site connections are included.

Do not assume that every design uses the same shipping method. The overall dimensions, roof details, porch and packing arrangement affect transport. Request a loading or packing proposal for your selected configuration and destination.

Discuss access, unloading space, supports, anchoring and utility routes before dispatch. Requirements depend on the actual cabin and location. Local approvals and the site design should be checked with the relevant local professionals.

CONTACT PQSE HOUSE

Tell Us About Your Apple Cabin Project

Share your intended use, quantity, destination and preferred cabin format. Add your glazing, interior and delivery requirements so we can discuss a practical configuration and quotation.

Suzhou, Jiangsu, China

Manufacturing and project support.

Phone & WhatsApp

+86 150 7039 1223

Email Sales

sales@pqsehouse.com