PQSE HOUSE · MODULAR BUILDING MANUFACTURER

About PQSE House
Modular Buildings
for Global Projects

PQSE House is a modular building manufacturer based in Suzhou, China. We design and manufacture container houses, site offices and portable sanitation units, bringing practical layouts, coordinated production and export support together for your project.

BASED IN
Suzhou, China

Manufacturing & project support

CORE SYSTEMS
Modular Buildings

Container, office & sanitation units

PROJECT INPUTS
OEM / ODM

Layout, materials & utilities

DELIVERY SUPPORT
Export Projects

Packing, documents & installation guidance

PRODUCT SYSTEMS

What We Manufacture

PQSE House offers modular building systems for accommodation, workplaces and everyday site facilities. We help you select the right building type and develop a layout around the people who will use it.

STRUCTURAL SYSTEMS

Container House Systems

Choose from flat pack, folding, expandable and detachable container systems for accommodation, temporary facilities and multi-unit developments.

Combine room layouts, finishes and service connections to suit the size and purpose of your project.

WORKSPACE MODULES

Container Office

Create useful space for daily work, meetings, site management and security with configurable container offices.

PQSE House helps plan partitions, door positions and electrical outlets around your working routine.

SERVICE MODULES

Portable Sanitation Units

Provide toilets, bathrooms and showers for construction sites, accommodation camps and temporary facilities.

Plan the number of fixtures, water and drainage connections, ventilation and cleaning access as one complete arrangement.

CABIN ACCOMMODATION

Prefab Cabins

Compare gable-roof, Apple and space capsule cabins for standalone accommodation.

Choose the cabin profile, then plan the room layout, fit-out and delivery access around your project.

FACTORY & PRODUCTION

Manufacturing, From Steel to Shipment

Our manufacturing work brings steel preparation, frame fabrication and module assembly into a coordinated process. Explore the main stages, from incoming materials to packing for delivery.

01 / 06

Raw Materials

We check incoming steel and components against the project specification before they enter production.

02 / 06

Frame Production

Steel is cut, formed and fabricated into the frames that support the selected building system.

03 / 06

Panel & Assembly

Wall, roof and floor panels come together with the openings and finishes selected for your layout.

04 / 06

Pre-Assembly

Trial assembly helps check the fit of modules, doors, windows and connection points before dispatch.

05 / 06

Surface Finish & Staging

Surface finishing and orderly staging prepare frames for the next assembly or packing stage.

06 / 06

Protective Packing

We organize component protection, identification and packing around the loading and transport plan.

ENGINEERING & OEM / ODM

Built Around Your Project

A useful modular building starts with understanding how it will be used. PQSE House works with you on layouts, materials, services and finishes, then brings those choices into the production plan.

01Project Brief illustrative scene

Project Brief

Input: your project needs

We start with your destination, building use, number of occupants and target schedule. Understanding the site and your priorities helps us recommend a suitable approach.

What you receive: A clear room list, project brief and next steps.

02Layout & Configuration illustrative scene

Layout & Configuration

Output: proposed layout

Plan room sizes, doors, windows and the way people move through the building. Our team helps combine modules into a layout that works for daily use.

What you receive: A proposed layout for your review.

03Materials & Utilities illustrative scene

Materials & Utilities

Output: material choices

Compare wall and roof panels, insulation, finishes and service connections. PQSE House helps you consider the building environment alongside the intended use.

What you receive: Coordinated material and utility requirements.

04Drawings & BOM illustrative scene

Drawings & BOM

Output: technical package

Our engineering team brings the selected layout and materials into the drawings and bill of materials needed to prepare production.

What you receive: Project drawings and material information.

05Branding & Packing illustrative scene

Branding & Packing

Output: finish & packing plan

Discuss your preferred colours, identification and packing priorities. We prepare these details alongside the configuration so the order arrives ready for the next stage.

What you receive: Confirmed finishes, identification and packing details.

06Local Standard Inputs illustrative scene

Local Standard Inputs

Input: destination criteria

Share the climate conditions, site requirements and local approval criteria for your project. We review these inputs with you and agree which checks and documents are needed.

What you receive: Destination-specific requirements and review responsibilities.

07Change Control illustrative scene

Change Control

Output: coordinated revisions

When a layout or specification changes, our team reviews its effect on materials, production and delivery before updating the project information.

What you receive: A clear revision for the next production stage.

Send us your drawing or room list. We can help turn your ideas into a practical building proposal.

QUALITY CONTROL

Quality Checks at Key Stages

Quality checks connect materials, fabrication, assembly and loading. Our team uses the project specification to identify what needs checking and keeps the relevant records for review.

9 checkpoints

01 · Incoming Materials

Check material identity, dimensions and the specification needed for production.

02 · Dimensions & Welding

Review frame dimensions, connections and weld details before assembly progresses.

03 · Surface Treatment

Inspect surface preparation, coating and finish against the selected requirements.

04 · Panel Assembly

Check panel alignment, joints and openings so the building components fit together.

05 · MEP Installation

Review electrical and plumbing installation details and the planned site connections.

06 · Waterproofing

Check roof joints, wall interfaces and openings for the required weather protection.

07 · Pre-Assembly Fit

Check the operation and fit of doors, windows and module connections.

08 · Final Inspection

Work through the final checklist and resolve outstanding items before release.

09 · Loading Release

Review packing, identification and protection before the shipment leaves.

Ask PQSE House about the inspection checklist and records available for your selected product.

CERTIFICATIONS & DOCUMENTATION

Certificates & Test Reports

Explore the displayed product attestations, material test reports and management-system documents. Open each document to check its holder, covered product, issue date and scope. For your order, request the documents that apply to the quoted manufacturer and configuration; a group-company certificate does not automatically cover every product.

HOW WE WORK

From Your First Brief to Delivery

PQSE House keeps the next step clear, from your first inquiry to installation support. We work through your building needs, confirm the details and coordinate production and delivery with you.

01 · DEFINE

01 · Project Brief

Tell us where the building will be used, what it needs to do and when you need it.

Deliverable
Project brief

02 · Layout & Configuration

Work with our team on the room arrangement, module combination and service requirements.

Deliverable
Proposed layout
02 · CONFIRM

03 · Quotation

Receive a proposal covering the selected products, configuration and commercial terms.

Deliverable
Project quotation

04 · Technical Confirmation

Confirm the drawings, materials and key details together before production begins.

Deliverable
Approved specification
03 · MANUFACTURE

05 · Production

Follow the progress of fabrication and assembly with your PQSE House project contact.

Deliverable
Production updates

06 · Inspection

Review the required checks and production records before the order is released.

Deliverable
Inspection records
04 · DELIVER

07 · Packing & Dispatch

Prepare components, packing information and shipment arrangements for the delivery plan.

Deliverable
Packing & delivery documents

08 · Installation Support

Get the agreed drawings and guidance to help your installation team prepare and assemble.

Deliverable
Installation information
TEAM & EXPORT SUPPORT

A Team That Works with You

Behind each project is a team working across sales, engineering, production and delivery. Your PQSE House contact brings the right people into the conversation when decisions need to be made.

Sales

Understands your project needs and helps identify the right products and next steps.

Engineering

Develops layouts and drawings while coordinating materials and service interfaces.

Production

Organizes material preparation, fabrication and assembly around the production plan.

Quality

Coordinates inspection checkpoints, records and the final release review.

Project Coordination

Keeps approvals, packing, logistics and installation information moving together.

Talk to our team about your layout, manufacturing and delivery requirements.

APPLICATION REFERENCES

Modular Buildings for Real Project Needs

Different sites call for different spaces. PQSE House helps project teams plan offices, accommodation and support buildings around everyday use, available space and local project requirements.

CLIENT FEEDBACK

What Our Customers Say

Customers share their experience of working with PQSE House, from planning room layouts to preparing for delivery and installation.

Tell Us About Your
Modular Building Project

Tell PQSE House where your project is located, the building type and quantity you need, and your target schedule. Our team will help you explore suitable options and prepare a practical quotation.

Suzhou, Jiangsu, China

Manufacturing and project support office.

Talk to PQSE House