PQSE HOUSE · PREFAB CABINS

Prefab Cabins for Sale
for Resorts &
Private Retreats

Explore gable roof cabins, apple cabins and space capsule houses with PQSE House. Compare the appearance, room layout and delivery approach for your resort, glamping site or private retreat, then share your brief for a suitable configuration and quotation.

CHOOSE YOUR CABIN

Choose Your Prefab Cabin Style

Start with the cabin style, then compare the room layout and the work needed at your site.

Gable Roof Cabin

A pitched-roof cabin direction for cottage-style accommodation, with room layouts and porch options to discuss.

Apple Cabin

A rounded cabin profile for accommodation or small commercial spaces, with glazing, privacy and fit-out planned around its use.

Space Capsule House

A distinctive pod-style cabin direction for guest stays, with bedroom, bathroom and viewing areas considered together.

The cabin and interior images illustrate design directions. The selected model and agreed specification determine the final appearance and supplied items.

COMPARE THE DIRECTIONS

Compare the Look, Layout and Delivery Needs

Use the cabin profile as a starting point. Confirm the selected model and supply scope before comparing detailed specifications.

Compare Apple Cabin and Space Capsule layouts. Compare gable-roof and A-frame cabin choices.

Gable Roof Cabin

APPEARANCE

Pitched roof and a cottage-style profile.

SPACE PLANNING

Bedroom, bathroom and porch arrangement.

REVIEW FIRST

Roof build-up, wall specification and assembly scope.

SITE DISCUSSION

Foundations, access and assembly conditions.

Apple Cabin

APPEARANCE

Rounded rectangular shell and a glazed elevation.

SPACE PLANNING

Open or divided space, glazing and privacy.

REVIEW FIRST

Shell, windows and interior fit-out.

SITE DISCUSSION

Transport access, placement and service connections.

Space Capsule House

APPEARANCE

Pod-style profile with a prominent viewing area.

SPACE PLANNING

Guest room, bathroom and viewing direction.

REVIEW FIRST

Selected model, equipment and transport dimensions.

SITE DISCUSSION

Access, lifting space, supports and connections.

APPLICATIONS

Plan Cabins Around How They Will Be Used

01

Resort & Holiday Accommodation

Plan room types, privacy, outdoor space and daily maintenance access.

02

Glamping & Nature Stays

Consider the view, paths, shading and the services available at the site. Compare prefab cabins and glamping tents against the same guest requirements.

03

Private Retreats & Guest Rooms

Discuss sleeping space, bathroom facilities, storage and intended use.

04

Reception & Small Commercial Spaces

Match the entrance, glazing and interior arrangement to visitors and daily operations.

FROM ONE CABIN TO A CABIN SITE

Plan the Space Around Your Cabins

For resorts and private retreats, the space between units is part of the accommodation experience. Share a site sketch as well as your preferred cabin style.

01

Views & Private Outdoor Space

Orient glazing and entrances around the outlook, sun and neighbouring cabins. Allow for a deck or porch where it suits the selected model and site.

02

Guest Routes & Service Access

Plan paths, luggage access and housekeeping routes together. Keep room for servicing, equipment access and safe movement around the units.

03

Utilities & Phased Installation

Coordinate power, water and wastewater routes before placing cabins. For a phased project, identify future units and the access needed to install them.

LAYOUT & FIT-OUT

Plan the Rooms, Finishes and Services Together

Sleeping & Living Space

Review beds, circulation, storage, door positions and privacy before fixing the layout.

Kitchenette & Storage

Discuss cooking requirements, appliance dimensions, cabinets and service connections.

Bathroom & Services

Coordinate fixtures, hot water, electrical requirements, water supply and drainage.

Exterior Finish
Glazing & Privacy
Insulation
Electrical & Plumbing

Discuss the layout and fit-out as a package. The selected model and quotation should identify the items included, optional additions and connections to be completed on site.

LOOK BEYOND THE EXTERIOR

Specify the Cabin from the Frame Outward

A cabin style helps set the design direction. The structural system, enclosure and openings determine what needs to be confirmed in the product specification.

Frame & Floor System

Start with the load path and support arrangement. The frame, base and floor should be considered together with the selected cabin model.

Walls, Roof & Exterior Finish

The visible finish is one part of the enclosure. Review the wall and roof build-up alongside the destination climate and maintenance needs.

Glazing, Daylight & Privacy

Balance the view with how the room will be used. Window position, opening sections and shading influence both the room layout and the guest experience.

DELIVERY & SITE PREPARATION

Plan Delivery and Site Work Together

Component & Kit Delivery

Some systems may be supplied as components for assembly at the destination. Confirm the packing format, assembly sequence and work required for the selected model.

Assembled Module Placement

Discuss transport dimensions, route access, unloading or lifting space, supports and service connections before arranging delivery.

01

Select the Model

Choose the cabin family, intended use and proposed room arrangement.

02

Confirm the Supply Scope

Separate supplied components and fit-out from destination works.

03

Plan Transport & Site Access

Review the route, unloading area, lifting plan and storage space.

04

Prepare Installation & Connections

Coordinate supports, assembly, service connections and final checks.

PRICE & PROCUREMENT

Compare Cabin Quotes on the Same Scope

Model & Layout

Cabin style, size requirements, room arrangement and glazing.

Materials & Fit-out

Envelope, insulation, fixtures and the level of interior completion.

Quantity & Delivery

Order quantity, destination, packing, transport and unloading scope.

Site Responsibilities

Foundations, assembly, connections and destination requirements.

Ask for the proposed layout, specification, inclusion list and packing information with your quotation.

BUYING QUESTIONS

Questions About Buying Prefab Cabins

These terms describe different aspects of a building: prefabrication, relocation and modular construction. Review the actual structure and delivery method rather than choosing by the label alone.

Start with the number of guests, preferred appearance, privacy, site access and intended fit-out. Compare the available cabin directions against those requirements before choosing a model.

Discuss these requirements with the selected model. Confirm the fixture list, service routes, usable space and items included in the quotation.

The delivery method depends on the product and specification. Confirm the packing format, destination assembly and lifting requirements for the proposed configuration.

The support arrangement and services depend on the selected building and site. Share ground conditions, access and water, drainage and power arrangements for review.

Provide the project location and applicable requirements. These inputs help determine which materials, insulation, glazing and supporting documents should be reviewed.

Use the specification and inclusion list to identify the cabin, fit-out, packing, transport and site work covered. Optional additions and destination responsibilities should be stated separately.

Send the intended use, quantity, destination, preferred cabin style and target schedule. A room layout or site access notes will help make the discussion more specific.

CONTINUE YOUR PLANNING

Explore Systems, Accommodation and Buying Guides

Container House Systems

Compare other building systems for your project.

Modular Hotel Room Planning

Plan room units within a wider accommodation project.

Buying & Planning Guides

Explore practical building and procurement topics.

CONTACT PQSE HOUSE

Tell Us About Your Cabin Project

Share your preferred cabin style, intended use, quantity and destination. Add a layout idea or site notes if you have them, so the next discussion can focus on a practical configuration and quotation.

Suzhou, Jiangsu, China

Manufacturing and project support.

Phone & WhatsApp

+86 150 7039 1223

Email Sales

sales@pqsehouse.com