A contractor in Ghana needed modular accommodation that could grow with labour demand and be removed after the work. PQSE House was responsible for the modular-building work. The brief put occupancy, room standards and washing provision ahead of module quantities, with space reserved for later blocks and pedestrian routes.
The central decision is what each furnished room can reasonably accommodate before repeating it across the plot. This brief develops that planning approach; the final room count and selected building system are not established in the available project information. The photographs illustrate room and building arrangements as references, rather than documenting the Ghana installation.
Furnish the room before calculating capacity
Start with a room drawing that shows the intended beds, personal storage, door movement and access to each sleeping place. Use internal dimensions after partitions and finishes, rather than the module’s external footprint. A wardrobe, desk or private bathroom changes the space left for everyday movement.
Keep the proposed room type consistent when comparing quantities. Adding occupants to an unchanged shell is a different proposal from adding another furnished room. If sharing preferences or rest schedules require separate rooms, carry that distinction into the room list instead of averaging everyone into one bed total.

Give bedrooms and washing facilities the same planning basis
List the residents expected at each stage, then show which toilets, showers and handwashing facilities serve them. Identify who uses those facilities at the same time, including staff outside the sleeping-room list where relevant. A service block sized for the opening stage should not silently become the provision for every later bedroom.
The IFC/EBRD workers’ accommodation guide discusses personal storage, privacy, accessible sanitary facilities and cleaning. These are useful qualitative checks for the room and facility drawings. Its 2009 benchmarks are not a Ghanaian approval standard or evidence of this project’s permitted occupancy or fixture ratios.
A portable bathroom layout can be compared against that resident schedule. Show the selected fixtures, privacy arrangements and service access together with the water and wastewater connections. Our worker camp accommodation solution covers the wider choice of rooms and daily facilities.
Compare the opening, expanded and reduced camp
Prepare three versions of the room list on the same plot. Keep the agreed occupancy of each room type unchanged so that the difference between the stages is visible. The table below is a proposal review, not a record of installed quantities.
| Operating stage | Room and facility decision | Plot decision |
|---|---|---|
| Opening workforce | Identify the furnished rooms and washing facilities needed for the first residents. | Keep the intended expansion area and its delivery access identifiable from the outset. |
| Peak workforce | Add the required room types and reassess the facilities serving the combined residents. | Show where the new blocks sit and how residents continue to reach daily facilities during installation. |
| Reduced workforce or close-out | Identify which rooms and services remain in use, and which can be disconnected. | Show the removal route without cutting off access to occupied rooms or retained facilities. |
Reserved land only helps if it remains reachable. Compare the delivery and removal space with the pedestrian routes, service connections and any buildings that stay occupied. The Malaysia contractor accommodation brief examines opening each phase with its shared facilities; this Ghana brief adds the room-count and later reduction comparison.

Choose the building package around the room plan and later removal
Compare building systems after the room arrangement is clear. Flat pack container houses combine prepared floor and roof assemblies with components fitted on site. Detachable container houses use a component-based assembly approach. Either comparison needs the actual layout, package and local assembly resources; neither name establishes what was used on this Ghana project.
Ask how the proposed buildings would be removed: as assembled rooms, partly dismantled units or separated components. Include disconnection, handling, packing and replacement items in that discussion. Leaving room for a truck on the plot does not establish that a furnished building is suitable for lifting or transport as a whole.
Give each quotation the same accommodation brief
Send the opening and peak resident schedules, furnished room types and proposed washing provision with the plot sketch. Include the intended reduction or removal sequence. This lets the comparison distinguish additional bedrooms from additional service capacity.
Separate the building package and fit-out from foundations, unloading, installation and external services. Name the party responsible for each interface and the local design and approval review. The short project brief does not establish those supply boundaries, so they need to be agreed for the proposed order.
Questions about changing workforce numbers
How many workers can one module accommodate?
There is no reliable answer from the module label alone. Use the furnished internal layout, intended sharing arrangement and applicable local requirements to establish the proposed room capacity. Then calculate how many of each room type the resident schedule needs.
Can extra beds replace the next accommodation block?
Only if a revised room layout and occupancy review support that change, alongside the facilities serving the added residents. Extra furniture does not create more usable circulation space or washing capacity. Compare that revised proposal with adding rooms before selecting the next phase.
Source
IFC and EBRD, Workers’ accommodation: processes and standards, August 2009, Part II, sections C–D, printed pages 13–14. Used for qualitative room, storage and sanitary-facility considerations; project design and local requirements remain separate.