Reaction to fire describes how a product contributes to a fire. Fire resistance describes how a building element maintains specified functions for a stated period under test conditions. They answer different questions. A panel core name, a reaction class and a wall's fire-resistance period are not interchangeable descriptions.
For a modular-building order, the useful question is: what product or assembly does this result actually cover? Start with that scope before comparing suppliers' labels.
What does each fire rating tell you?
The European EN 13501 framework separates these classifications. BSI's public overview of Part 1 describes reaction-to-fire classification of construction products, considered in their end-use application. It is not simply a classification of loose insulation material.
The public scope of Part 2 covers classification using fire-resistance and/or smoke-control test data within defined application limits. Those limits can include documented extended application of results.
| Claim on the offer | What it addresses | What to compare |
|---|---|---|
| Reaction-to-fire classification | The product's contribution to fire in its assessed end use | Exact product, build-up, classification and end-use conditions |
| Fire-resistance classification | Specified functions of the assessed building element for a stated period | Element type, functions, period and documented field of application |
| “Rock wool panel” or another core description | A material choice in the panel package | Full panel specification and relevant performance evidence; the core name is not an assembly rating |
This distinction also matters when comparing EPS and rock wool panel packages. Choosing a core and establishing the offered assembly's performance are separate decisions.
Why EI and REI are different claims
In the R/E/I terminology explained by panel manufacturer Profilacier, R concerns loadbearing capacity, E integrity and I insulation. An EI classification does not, by itself, establish loadbearing capacity (R). The accompanying number identifies the classified period for the stated functions; escape time in a real building fire cannot be inferred from that classification alone.
An offer showing a reaction class and another showing an EI classification may therefore be describing different properties, rather than better and worse versions of one score. Ask for both offers to identify the project requirement they address. The project specifier must determine which classifications and periods are needed for the location and building use.
Match the panel result to the proposed wall
Panel thickness, facings, joints, supports and installation conditions help define the assessed construction. A result for one arrangement should not be transferred to another by appearance alone. Equally, a difference does not automatically make a result unusable: check whether the documented direct or extended field of application covers it.

For example, a report describing a particular wall build-up does not establish the performance of doors, service penetrations, the roof or complete room outside its documented scope. Keep those interfaces in the specification. The container-house insulation guide explains other panel decisions, including thermal bridges and moisture; thermal performance does not replace fire-performance evidence.
If a supplier proposes a different panel after quotation, compare it with the agreed build-up before approving the change. Use the offered-variant comparison to keep the original specification, proposed alternative and unresolved differences visible.
What to send with your enquiry
For a flat pack container house configuration, send the destination, room use, wall or roof application, layout and any fire requirements already set by the project team. Ask which proposed panel and assembly documents are available and applicable; do not assume a catalogue image establishes a rating.
Keep material and performance documents alongside the drawing and supply schedule. The quality-control checklist helps separate product evidence from factory-release and packing checks. These records serve different purposes.
Frequently asked questions
Does a non-combustible core make the whole building fire rated?
No. A core description does not establish the performance of the complete panel, wall, openings or building. Identify the assessed product or element and its application scope.
Can a fire-resistance period be compared across test systems?
Do not assume two results are equivalent because their numbers match. Confirm the test and classification basis, functions, construction and destination requirements with the project specifier.
Can PQSE supply a particular fire rating?
That must be checked for the actual configuration and required evidence. Send the project's stated requirement and proposed wall or roof build-up so the team can review the request; this guide does not establish a rated PQSE model.
Next step
Compare the required property and the covered assembly before comparing a rating label. A clear project brief lets the supplier identify which proposed package and documents need review.
Source scope: BSI's public Part 1 overview and Part 2 scope above establish the classification distinction. The Knauf terminology guide explains the different functions. These references do not establish local approval or a PQSE product's performance.